Projects

New Design + Technology Block, St. Josephs School, Sailsbury
EDUCATION

2018

The school required the new facilities to provide food technology, product design and IT classrooms, together with toilets and offices. The building was designed in two phases to high environmental standards, both in terms of energy use, materials and on-site energy generation.

Phase 1 was completed in March 2018. The second phase includes additional 6no. of general classrooms.