Projects

High Depedancy Unit, Bristol Royal Infirmary
HEALTHCARE

2011

The transformation of an existing unit within a challenging 18 week construction period.

New high care cubicles presented particular design challenges, requiring clear visibility of patients from the nursing station as well as careful control of the internal environment through negative pressurisation to reduce the risk of cross infection.

We also designed bespoke floor mounted services bollards for use throughout the unit.

The colours and finishes were specifically chosen to create a calm and reassuring atmosphere throughout. A high level of design co-ordination ensured that all services were fully concealed but accessible for maintenance.